Demas Rusli

ARCH1101 Architectural Design Studio 1

Thursday, June 10, 2010

Peer Assessment Sheets


Posted by Demas Rusli at 9:41 AM
Labels: peer assessment sheet

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Links

  • Demas Rusli
  • ARCH1102 (Semester 2 2010)
  • ARCH1142 (Semester 2 2010)
  • ARCH1201 (Semester 1 2011)

Blog Archive

  • ▼  2010 (50)
    • ▼  June (12)
      • EXP3: The Bridge SUBMISSION Information
      • 1 X FULLY DEVELOPED CRYSIS WARS ENVIRONMENT
      • Experiment 3 Video
      • 5 REAL TIME IMAGE CAPTURES OF THE DEVELOPED CRYSIS...
      • Other Image Captures of Final Environment (not for...
      • 4 REAL TIME IMAGE CAPTURES SHOWING 2 DRAFT CRYSIS ...
      • 1 X SKETCHUP MODEL THAT INCLUDES THE TWO ELEVATORS...
      • Inspirations and Initial Sketches
      • Peer Assessment Sheets
      • 36 CUSTOM TEXTURES
      • 18 SKETCH PERSPECTIVES
      • 18 Initial Two-Point Perspectives
    • ►  May (13)
    • ►  April (16)
    • ►  March (9)
Simple theme. Powered by Blogger.